To view these pages you need to have Acrobat Reader.
You can download it here:
Complete brochure of the Tecnaria stud and crampon dowel for
timber-concrete composite floors
File Pdf (797 Kb)
Complete report of the tests performed on Tecnaria connectors
according to Eurocode 5 at the CNR National Research Council Facilities at Florence
File Pdf (1.1 Mb)
The Tecnaria archive:
Example of the construction of a new single frame floor using "base" connectors and
interrupted planking.
La Fenice Theatre - Venice
File Pdf (346 Kb)
The Tecnaria archive:
Example of the construction of a new single frame floor using "base" connectors and
core-bored planking.
Villa Imperiale - Galliera Veneta (Pd)
File Pdf (410 Kb)
The Tecnaria archive:
Example of the recovery of an old single frame floor using "maxi" connectors mounted
over the planking.
Campo Manin complex - Venice
File Pdf (364 Kb)
The Tecnaria archive:
Example of the recovery of an old double frame floor with "base" connectors.
Villa Borromeo Arese - Cesano Maderno (MI)
File Pdf (356 Kb)
Installation instructions for "Base" connectors on new or
existing wooden floors
File Pdf (337 Kb)
Installation instructions for "Maxi" connectors on new or
existing wooden floors
File Pdf (337 Kb)
Technical brief indicating the drawings and mechanical
properties of the connectors for calculation purposes (according to the "admissible
stress" and "limit states" methods).